System Design & Installation Process

EcoSystem Infra Pvt. Ltd. provides a modular and high-load bearing rainwater harvesting solution designed for effective groundwater recharge.

Step

Drilling Work

Initial drilling is carried out as per site survey and water table depth.

Step

Excavation & Base Preparation

Excavation of pit and preparation of strong base foundation.

Step

Laying of Geotextile

Geotextile fabric is laid to prevent soil particles from entering the system.

Step

Module Installation

EcoSystem modular units (Load capacity 30–50 Ton) are installed.

Step

Back Filling

Backfilling is done carefully to secure modules and maintain stability.

Step

Filter Connection

High-capacity filtration units are connected for clean water flow.

Step

Site Completed

Final inspection and site completion for efficient rainwater recharge.